Description
Stock-to-Ship Advantage — QMY10-15 mobile block machines sit in our yard fully assembled, factory-tested, and ready for container loading, so your project start date is not held hostage by a build schedule.
Technical Specifications
| Parameter | Value |
|---|---|
| Product Type | Mobile Concrete Block Making Machine |
| Model | QMY10-15 |
| Molding Capacity | 10 pcs/mold |
| Molding Cycle | 10 s – 15 s |
| Total Power | 16 kW |
| Output Capacity | 11,000 pcs/day (8 hours) (basis not stated in source — confirm block format / material / thickness) |
| Vibration System | Dual vibration motors |
| Hydraulic System | Upper and lower demoulding control with heat dissipator |
| Mobility | Electric walking, hydraulic steering |
| Pallet Requirement | No pallets (egg-laying type) |
| Basic Equipment Included | QMY10-15 host machine, JS7500 concrete mixer, dump truck |
| Optional Equipment | PL1200 batching machine, cement silo, screw conveyor, loader |
| Mould Compatibility | Interchangeable for hollow, interlocking, and solid block formats |
| Automation Level | Semi-automatic with hydraulic pressure and engine |
| Voltage & Frequency | Configurable to destination grid (verify before dispatch) |
| Standards | CE (documented where applicable) |
Application Suitability
| Application | Material or Output |
|---|---|
| On-site hollow block production | Crushed stone, sand, and cement blends |
| Interlocking paver manufacturing | Fine aggregate with cement binder |
| Solid block production for housing projects | Local gravel and cement mixes |
| Remote infrastructure sites | Any locally available aggregate and cement |
| First-plant entrepreneur operations | Low-volume startup with minimal fixed infrastructure |
Why the Voltage Question Must Come Before the Container
Confirming voltage, frequency, and PLC language at order stage prevents the machine from sitting idle on arrival.
I once watched a mobile egg-layer sit on a job site in Peru for three weeks because the hydraulic pump motor was wound for 380V/50Hz while the local supply was 220V/60Hz. The pump ran backwards, nobody caught it until the relief valve overheated, and a simple wiring mismatch turned into a costly delay [NEED_CITE: voltage and frequency standards by export market]. Every QMY10-15 mobile block machine in stock still on the floor is listed with its current winding configuration, and we confirm your local grid before any unit is earmarked for dispatch. Getting this detail right in the first conversation is the single most effective way to protect your project timeline.
Stocked Units and Dispatch Timelines
Buyers working against project deadlines cannot afford a multi-week build cycle. The QMY10-15 mobile block machine in stock is pulled from a pool of completed units that have already passed factory vibration and hydraulic pressure tests. Once your destination port and block format are confirmed, the machine is matched to a compatible mould set and prepared for container dismantling. Lead time is quoted in days from order to gate-out, not weeks.
Container Loading and Dismantling Strategy
Mobile egg-laying machines do not ship assembled. The host frame, hydraulic steering assembly, and mixer are broken down into components that fit a standard 40-foot container. Dismantling is documented with packing photographs so your unloading crew knows exactly which bolt group reconnects first [NEED_CITE: container loading procedures for heavy mobile equipment]. We state the container type and stuffing plan in the quotation itself, so there are no surprises at the port of loading.
What the Dual Vibration and Hydraulic Demoulding Mean on Site
The dual vibration motors work in tandem with hydraulic upper and lower demoulding to compact the concrete mix evenly before release. Vibration force and hydraulic pressure must both match the buyer’s aggregate grading and cement content; too little vibration and the block crumbles at the edges, too much and the fines separate from the coarse aggregate. The heat dissipator fitted to the hydraulic circuit keeps oil temperature stable during continuous operation, which is particularly relevant in tropical climates where ambient heat already pushes the system toward its thermal limit. The 10-second to 15-second molding cycle keeps the machine moving steadily across the curing floor without rushing the operator.
What Happens When Pallet and Curing Logistics Are Overlooked
Egg-laying machines drop blocks directly onto the ground, eliminating pallet investment and curing-rack infrastructure. But if the curing floor is not level, or if the walking path is obstructed, the machine deposits blocks on uneven surfaces and the bottom course cracks under its own weight. Contractors who assume any patch of dirt will do end up with a rejection rate that erodes the cost advantage of going pallet-free [NEED_CITE: common causes of block breakage in mobile egg-laying production]. Confirming ground preparation requirements before the machine ships avoids this avoidable loss.
Why Buyers Source This Machine Through Our Stock Channel
Our single focus on block machinery means the host machine, mould, mixer, and dump truck are specified as one matched set rather than assembled from separate suppliers. Dispatch dates are quoted against actual yard inventory, not production schedules. Mould formats stocked alongside the machine cover the hollow, interlocking, and solid blocks that most project sites require. Voltage, frequency, and control language are confirmed against the destination country before the unit is released. Every machine ships with a factory test record and packing photographs so you verify condition before the container doors close.
Documentation & Verification
- Factory test record on your specified block format before dispatch
- Hydraulic and electrical schematic matched to your confirmed voltage
- Voltage and control language confirmation sheet signed off at order
- Packing photographs showing dismantling state and container loading
- Operation and maintenance manual in your chosen language
- Mould drawing and format list for every interchangeable mould included
Installation, Commissioning & Support
- Ground leveling guidance for egg-laying operation across the curing area
- Power connection matching the confirmed voltage and frequency specification
- Reassembly sequence for hydraulic steering and electric walking system
- First-run block test using your local aggregate and cement blend
- Operator training on mould change and molding cycle adjustment
- Wear parts list covering hydraulic seals and vibration motor bearings
Before You Request a Quote
Tell us the block format and dimensions your market requires, the daily volume your project demands, and the aggregate materials available at your site. Share your local voltage, frequency, and preferred control language so the correct QMY10-15 mobile block machine in stock is reserved for you. If you have an existing mixer or loader on site, let us know so we can adjust the basic equipment package accordingly.
Frequently Asked Questions
Q: What block format does the quoted daily capacity assume?
A: The 11,000 pieces per day figure is listed in the manufacturer data without specifying the block format, wall thickness, or material blend. Before we confirm dispatch, we request your target block dimensions and mix design so we can calculate realistic output per format and adjust the molding cycle accordingly.
Q: Is this model in stock now, and how fast can it reach my port?
A: Stocked QMY10-15 units are available in our yard for immediate preparation. Dispatch-to-arrival timelines depend on your destination port and the shipping schedule at the time of order. We quote an arrival estimate upfront so you can plan your project mobilization around a known date.
Q: What voltage is the stocked unit wound for, and can it be changed?
A: Each stocked unit carries its current voltage and frequency configuration, which we disclose before you commit. If the winding does not match your local grid, motor rewinding or replacement is arranged before the machine leaves the factory, not after it arrives on your site.
Q: Which moulds ship with the stock machine, and can I add more?
A: The standard stock package includes moulds for common hollow and solid block formats. Additional moulds for interlocking pavers or custom dimensions can be added to the shipment if they are available in our mould inventory at the time of order.
Q: How is the machine dismantled for container loading?
A: The host frame, hydraulic steering assembly, mixer, and dump truck are separated into components that fit a standard 40-foot container. Packing photographs document the dismantling state, and the reassembly manual shows your crew which connections to make first on site.








