Description
Dispatch-ready block lines — every Qt10-15 automatic block machine leaves our yard as a complete matched set of press, pallets, moulds and handling stations, with arrival timing confirmed before you pay the deposit.
Technical Specifications
| Parameter | Value |
|---|---|
| Model | Qt10-15 |
| Product Type | Fully Automatic Concrete Block Making Machine |
| Overall Dimensions | 9350×2320×2950 mm |
| Total Mass | 10 T |
| Rated Pressure | 21 MPa |
| Vibration Form | Platform Vibration |
| Vibration Frequency | 2800–4500 r/min |
| Vibration Force | 60 KN |
| Pallet Size | 1100×900 mm |
| Molding Cycle | 15–25 s (basis to be confirmed) |
| Total Power | 44 KW |
| Demolding Method | Hydraulic |
| Water Consumption | 8 T/Day (basis to be confirmed) |
| Factory Area | 500 m² |
| Control System | PLC with person-machine conversation interface |
| Automation Level | Full automatic production line |
Application Suitability
| Application | Material or Output |
|---|---|
| Hollow Block Production | Crushed stone, sand, cement, fly ash |
| Solid Block Production | Gravel, sand, cement, slag |
| Paver and Colored Paver Production | Fine aggregate, cement, pigment |
| Interlocking Block Production | Crushed stone, sand, cement |
| Curbstone Production | Coarse aggregate, cement |
Why Arrival Dates Matter More Than Quoted Output
A block machine sitting in a factory warehouse does not pour concrete.
I have watched project contractors lose weeks because a machine arrived late, or arrived without the right moulds, while the building schedule kept ticking. When you are racing a deadline, the Qt10-15 automatic block machine in stock or on a short build schedule changes the math entirely. The real question is never just what the press can make in an hour, but whether the complete line — press, pallets, handling, and moulds — is actually ready to ship and clear customs on time [NEED_CITE: international shipping and customs clearance timelines].
Stock Availability and Container Loading
The Qt10-15 automatic block machine in stock status is confirmed at inquiry, not assumed from a catalogue listing. When a unit is available, we quote the exact dispatch date, the container type required, and the dismantling plan so you know which assemblies travel flat and which stay bolted together. This avoids the common surprise where a machine arrives in more pieces than the buyer’s rigging crew can handle on a tight site schedule.
Arrival Estimates Quoted Upfront
We provide an estimated arrival window at the order confirmation stage, based on the destination port and current sailing schedules. For the Qt10-15 automatic block machine with fast delivery, this estimate includes factory test completion, customs documentation preparation, and container booking lead time. You get a timeline you can build a project schedule around, not a vague promise that the machine will ship "soon" [NEED_CITE: ocean freight transit time variability].
Voltage and Language Confirmed Before Dispatch
Every market has its own electrical standards and operator language preferences. Before any Qt10-15 ships, we confirm the voltage and frequency match your local grid, and that the PLC person-machine conversation interface displays in a language your operators can read. This step happens before production, not after the machine arrives and refuses to start.
Inside the Press: What the Specs Actually Mean
The 21 MPa rated pressure and 60 KN vibration force work together to compact your specific mix into dense, uniform blocks. Platform vibration at 2800–4500 r/min ensures the concrete settles evenly across the 1100×900 mm pallet, reducing weak spots that cause breakage during handling. The hydraulic demolding system provides controlled ejection, protecting green block edges. Total power of 44 KW must be matched to a dedicated circuit at your site, and the PLC control system can be configured for your local voltage and operator language. The 10 T total mass requires a concrete foundation poured to specification before the machine arrives.
The Cost of Overlooking Dispatch Details
Ordering a block machine without confirming pallet size against your existing curing area and forklift capacity means the pallets may not fit your racks, forcing a secondary purchase. Skipping the voltage confirmation step leads to transformer rentals or rewiring delays that stall commissioning. When moulds are ordered separately after the machine arrives, you lose production days waiting for a second shipment [NEED_CITE: equipment commissioning delays from incomplete specifications].
Why Buyers Source This Model Here
Block machinery is our single focus, so the Qt10-15 ships as a complete system rather than a press bolted to mismatched peripherals from different suppliers. We set the configuration against your local aggregate and target block format, not a default catalogue setting. Moulds are designed for the formats your market actually buys, and standard moulds ship with the machine from stock when available. Automation level is selectable, so you can start with the full automatic production line and adjust handling stations to your labour plan. Installation support includes operator training at your site.
Documentation & Verification
- Line layout showing station spacing for the 9350 mm machine length
- Factory test record run on your specified block format before dispatch
- Pallet specification confirming 1100×900 mm dimensions and material grade
- Voltage and PLC language confirmation sheet signed before production
- Packing photographs showing dismantling state and container loading plan
Installation, Commissioning & Support
- Concrete foundation poured to match the 9350×2320 mm footprint before arrival
- Dedicated 44 KW power circuit installed with confirmed voltage and frequency
- Hydraulic system filled and bled during on-site commissioning
- PLC interface configured to operator language before first production run
- Mould change procedure trained with your crew on installed formats
- Wear parts list provided with reorder lead times for your region
Tell Us What You Need to Ship
Confirm your target block format, daily output requirement, and the local aggregate you will use in the mix. Provide your site voltage, frequency, and the language your operators need on the PLC display. State your project deadline so we can confirm whether the Qt10-15 automatic block machine in stock meets your schedule, or quote the realistic build and ship timeline if it must be produced to order.
Frequently Asked Questions
Q: Is this Qt10-15 model in stock or built to order, and what is the dispatch lead time?
A: Stock status for the Qt10-15 automatic block machine is confirmed at inquiry and changes with orders. If available, dispatch typically follows factory testing within a short window. Built-to-order units carry a production lead time quoted at the proposal stage, based on current workshop load and your configuration requirements.
Q: How is the machine dismantled and loaded into containers for shipment?
A: The Qt10-15 is dismantled into major assemblies that fit standard shipping containers. The main frame, hydraulic station, and PLC cabinet travel as separate units, with pallets and moulds packed to prevent transit damage. A detailed packing list and loading plan are provided before dispatch.
Q: Can the arrival date be estimated at the time of order confirmation?
A: Yes. We quote an estimated arrival window based on the destination port, current sailing schedules, and customs documentation requirements. This estimate is provided at order confirmation so you can align your site preparation and project schedule accordingly.
Q: Are standard moulds and pallets shipped together with the machine from stock?
A: When the Qt10-15 automatic block machine in stock is available, standard moulds and pallets sized at 1100×900 mm can ship in the same container. Custom moulds require additional lead time, which is quoted separately and may ship after the main machine if your deadline requires it.
Q: What voltage and frequency configurations are available for immediate dispatch?
A: Stock units may carry a standard voltage configuration that must be verified against your local grid. We confirm your required voltage, frequency, and PLC display language before release, and reconfigure if necessary before the machine leaves the factory.








