QT4-18 Automatic Concrete Block Making Machine – In Stock
In Stock · Ready to Ship
CE
Certified
ISO
9001:2015
108+
Countries
Semi automatic block

QT4-18 Automatic Concrete Block Making Machine – In Stock

<p><strong>QT4-18 Automatic Block Making Machine, 16MPa Hydraulic Pressure, 27.5kW</strong> — stocked and prepared for immediate container dispatch to meet tight project schedules.</p> <ul> <li>Platform vibration paired with 16MPa rated pressure for consistent block compaction</li> <li>950×550mm pallet format; verify curing area and forklift match before loading</li> <li>Schneider electricals with PLC frequency converter control</li> </ul> <p>Dispatch lead time and arrival estimate confirmed at order.</p>

  • European-Patented Airbag Damping System
  • Four-Motor Synchronous Vibration Technology
  • Siemens PLC Smart Control · Lifetime Tech Support
  • Customized Solution for Local Materials & Voltage
Lead Time
30 days
Warranty
12 mo
Sold
500+
Technical Excellence

Engineered for performance, built to last

Every parameter is verified through rigorous factory testing. No exaggeration -- just real production capacity backed by 320+ engineers.

Production Capacity
14,400 blocks/8h
Cycle Time
15-20 seconds
Total Power
88 kW
Operators
2-3 people

Product Description

QT4-18 Automatic Block Making Machine, 16MPa Hydraulic Pressure, 27.5kW — stocked and prepared for immediate container dispatch to meet tight project schedules.

  • Platform vibration paired with 16MPa rated pressure for consistent block compaction
  • 950×550mm pallet format; verify curing area and forklift match before loading
  • Schneider electricals with PLC frequency converter control

Dispatch lead time and arrival estimate confirmed at order.

Description

Dispatch from stock — QT4-18 block machine available now with dismantling plan, container loading layout, and port arrival estimate provided before you sign.

Technical Specifications

Parameter Value
Model QT4-18
Product Type Automatic Concrete Block Making Machine
Overall Dimensions 2500×1750×2200 mm
Rated Pressure 16 MPa
Vibration Form Platform Vibration
Pallet Size 950×550 mm
Molding Cycle 18–25 s (basis not stated in source — confirm block format)
Overall Power 27.5 kW
Control System PLC control with frequency converter
Electrical Components Schneider brand (source value — verify against manufacturer catalog)
Mould Lifting Mechanism Double-sided synchronous gears
Material Feeder System Hopper, feeding box, feeding platform, conveyor system
Block Receiver Frame, conveyor system, idler wheels with motor, reducer, triangle belt
Automation Level Automatic pallet feeding via hydro-cylinder, automatic demould and block conveying
Mould Change Method Manual bolt release, conveyor-assisted removal and installation
Voltage & Frequency Configurable to destination (basis not stated in source — confirm before dispatch)
Output Capacity Basis not stated in source — confirm block format, material, and thickness

Application Suitability

Application Material or Output
Hollow block production Crushed stone, cement, sand, and water
Solid block production Dense aggregate mix with cement binder
Paving block production Fine aggregate surface layer over coarse base mix
On-site construction block making Local quarry aggregate and Portland cement
First block plant startup Standard concrete masonry unit formats for regional market

Why Arrival Timing Matters More Than Quoted Cycle Times

A machine sitting in a workshop in Linyi does not help a contractor whose foundation crew is waiting.

Buyers often compare machines on cycle time alone, but the real deadline risk sits between the factory gate and the project site. I have watched orders stall because nobody confirmed whether the machine would ship from stock or enter a production queue, and by the time the container was booked, the construction schedule had already slipped. With the QT4-18 block machine in stock, the conversation shifts from "when will production finish" to "when does the vessel depart." [NEED_CITE: typical ocean freight transit times vary by destination port and carrier schedule]

The gap between order confirmation and machine arrival includes dismantling for container loading, inland transport to port, customs clearance, and ocean transit — each step adding days that compound into weeks if not planned upfront.

QT4-18 block machine in stock prepared for container loading

What Stock Availability Actually Means for Your Timeline

When a QT4-18 block machine in stock is allocated to your order, the lead time compresses to dismantling, inspection, and container stuffing rather than a full production cycle. This matters for project contractors who have already broken ground and need block production running before structural work advances. The machine is inspected against the configuration sheet, test-run on the pallet size specified, and then broken down into shipping sections that fit standard container dimensions.

Container Loading and Dismantling for Shipment

The QT4-18 measures 2500×1750×2200 mm in assembled form, which requires partial dismantling of the upper frame and hydraulic station for container loading. Supporting equipment — the JQ500 pan mixer, belt conveyor, and pallet trolley — can consolidate into the same container when the configuration is planned together. I always check whether the buyer needs the stacker and extra moulds in the first shipment or if those can follow in a second container, because splitting the line across two sailings means commissioning stalls halfway. [NEED_CITE: container loading plans for industrial machinery must account for weight distribution and lashing points]

Reading the Specs That Determine Dispatch Readiness

The 27.5 kW overall power draw means the QT4-18 needs a dedicated circuit at the site, and voltage must be confirmed before the electrical panel is wired — rewiring after arrival delays commissioning by days. The 16 MPa rated hydraulic pressure works with platform vibration to compact concrete into the mould cavity; if the buyer’s local aggregate has high clay content, the vibration frequency and pressure timing need adjustment during commissioning, not after the first week of weak blocks. The 950×550 mm pallet size must match the curing racks and forklift tines already at the destination site, because switching pallet dimensions later means replacing the entire pallet inventory. The PLC control with frequency converter allows cycle adjustment across the 18–25 second range, but the display language needs to be set before the panel leaves the factory to avoid operator confusion on day one.

PLC control panel and hydraulic station on QT4-18 block machine

The Cost of Ordering Without Confirming Dispatch Details

I have seen machines arrive at port with the wrong voltage configuration, sitting in a container while the buyer sources a step-down transformer that was never part of the plan. The PLC display showed Chinese characters because nobody ticked the language confirmation box on the order sheet, and the local electrician spent days navigating menus he could not read. [NEED_CITE: electrical commissioning delays are among the most common causes of startup setbacks in exported machinery] When voltage, frequency, and control language are confirmed before the QT4-18 leaves the factory, the machine powers up and runs on the first day instead of the fifth.

Why Buyers Source This Machine From Our Stock

The QT4-18 block machine in stock is configured as a matched system — press, pallets, mixer, and conveyor specified together rather than assembled from separate suppliers. Dispatch lead time is quoted at order confirmation, not estimated vaguely as "a few weeks." Container loading plans show exactly how the machine and supporting equipment fit, so there are no surprises at the port. Voltage, frequency, and PLC language are locked in before production or dispatch, removing the most common commissioning delays. Moulds and hydraulic wear parts ship with the machine so the first replacement cycle does not halt production.

Documentation & Verification

  • Factory test record run on your specified block format before container loading
  • Container loading plan showing machine dismantling sections and lashing arrangement
  • Voltage and PLC language confirmation sheet signed before dispatch
  • Pallet specification matched to your curing rack dimensions and forklift capacity
  • Hydraulic and electrical schematic for on-site troubleshooting during commissioning

Installation, Commissioning & Support

  • Foundation pad must support 2500×1750 mm footprint with level tolerance for platform vibration stability
  • Dedicated 27.5 kW circuit at confirmed voltage and frequency required before machine energization
  • Upper frame and hydraulic station reassembled on-site after container unloading
  • PLC parameters set to local aggregate mix design during first production run
  • Mould change procedure trained on-site using manual bolt release and conveyor-assisted method
  • Wear parts list provided with hydraulic seals and vibration components for first replacement cycle

What We Need to Move Your Order Forward

To allocate a QT4-18 block machine in stock and confirm your arrival estimate, we need your destination port, required voltage and frequency, target block format with dimensions, and the pallet size your curing area accommodates. If you already have a mixer or conveyor on-site, tell us so we can adjust the supporting equipment list and container loading plan accordingly.

Frequently Asked Questions

Q: Which QT4-18 configurations and moulds are currently in stock versus made-to-order?
A: Standard QT4-18 machines with common hollow block and solid block moulds are held in stock for fast dispatch. Custom mould designs drawn to your specific block dimensions enter a production queue. We confirm exact stock availability and dispatch date at inquiry so you can plan around your project deadline without guessing.

Q: What is the dispatch lead time and how is arrival estimated for my port?
A: Stocked QT4-18 machines are dismantled, inspected, and container-loaded within days of order confirmation. Arrival estimates are calculated from your destination port using current shipping schedules and quoted upfront. Transit time depends on carrier routing and port congestion, which we factor into the estimate provided at order.

Q: How is the machine dismantled and loaded into containers for shipment?
A: The QT4-18 is partially dismantled — upper frame separated, hydraulic station secured — to fit standard container dimensions. Supporting equipment like the mixer and belt conveyor consolidate into the same container. A loading plan documents weight distribution and lashing points so nothing shifts during ocean transit.

Q: Can voltage, frequency, and control language be confirmed before dispatch?
A: Yes. Voltage and frequency are set to your site supply before the electrical panel is wired. The PLC display language is configured to match your operators. Both are confirmed on a signed sheet before the machine leaves the factory, eliminating the most common commissioning delays we see on export orders.

Q: What supporting equipment ships together in the same container?
A: The JQ500 pan mixer, belt conveyor, pallet trolley, and block clamper can ship in the same container as the QT4-18 when the configuration is planned together. Stacker and extra moulds may require a second container depending on volume. We confirm the container plan at quotation stage.

Buy with Confidence

From inquiry to commissioning -- 4 transparent steps

  1. 01

    Technical Consultation

    Share your raw materials, capacity goals and voltage. Engineers reply within 24 hours.

  2. 02

    Custom Solution Design

    3D layout, mold drawings, electrical schematics and ROI calculation -- all free of charge.

  3. 03

    Production & Inspection

    Weekly progress photos, video reports, and virtual or on-site factory inspection.

  4. 04

    Installation & Lifetime Support

    On-site commissioning, operator training, spare parts supply and remote diagnostics.

Get a Quote

Talk to a senior engineer about QT4-18 Automatic Concrete Block Making Machine – In Stock

Response within 24 hours · English / Español / العربية. Our 320+ engineers will tailor a solution to your local market, raw materials and capacity needs.

Send Project Brief

By submitting, you agree to be contacted by Shandong Shiyue. We respect your privacy.

Ready to start your concrete block production line?

Join 500+ factories worldwide using Shandong Shiyue machinery. Get your customized proposal in 24 hours.