Fast dispatch readiness — QMY12-15 stock units ship with voltage, mould, and hydraulic parameters pre-verified against the buyer’s target block format, not configured from scratch after the order is placed.
Technical Specifications
| Parameter | Value |
|---|---|
| Model | QMY12-15 |
| Product Type | Movable Egg Laying Block Making Machine |
| Overall Dimensions (L×W×H) | 3250×2100×2300 mm |
| Total Mass | 4200 kg |
| Total Power | 16 kW |
| Hydraulic System Pressure | 16–20 MPa |
| Excitation Frequency | 3200 Hz |
| Vibration Mode | Three-dimensional mold vibration |
| Demold Method | Hydraulic |
| Turning Method | Hydraulic |
| Moving Method | Automatic movement with hydraulic steering |
| Molding Cycle | 15–20 s per cycle |
| Molding Capacity | 12 pcs per mold (400×200×200 mm hollow block) |
| Output Capacity | 2,880 pcs/h based on 400×200×200 mm hollow block at 15–20 s cycle |
| Output Capacity | 3,360 pcs/h based on 400×150×200 mm hollow block at 15–20 s cycle |
| Output Capacity | 5,280 pcs/h based on 400×100×200 mm hollow block at 15–20 s cycle |
| Compressive Strength of Produced Blocks | ≥15 MPa |
| Raw Materials | Fly ash, cinder, coal gangue, river sand, gravel, cement, industrial waste residue |
| Control System | Computer automatic control (basis to be confirmed) |
| Voltage & Frequency | Configurable per site supply (basis to be confirmed) |
| Block Formats | Hollow block, porous brick, road kerb, road brick, grassing brick (by changing moulds) |
| Automation Level | Semi-automatic with hydraulic steering and automatic movement |
| Warranty | 1 year for whole machine excluding spare parts |
Application Suitability
| Application | Material or Output |
|---|---|
| On-site hollow block production without a fixed plant | River sand, gravel, and cement at construction sites |
| Housing project block supply on a tight schedule | Fly ash, cinder, and cement blends for volume output |
| Mobile production moving between job sites | Coal gangue, industrial waste residue, and cement |
| Road kerb and paver production at remote locations | Crushed stone, river sand, and cement by mould change |
| Grassing brick for landscaping contractors | Porous aggregate and cement mixes |
What "Mobile Block Machine in Stock" Actually Means for Your Deadline
A stocked unit with confirmed dispatch lead time beats a custom-built machine that arrives after your pour date.
Buyers working to a construction milestone often discover that the mobile block machine they ordered was never physically ready — it was quoted as "available" but still required weeks of configuration. The voltage was never locked to the site grid. The mould was swapped at the last minute to match a format the buyer needed but the factory did not have on hand. The result is a machine sitting in a container yard while the site crew waits. [NEED_CITE: common delays in block machine export preparation]
Dispatch Timing You Can Plan Around
When you source a mobile block machine in stock from a supplier that holds configured units, the lead time conversation shifts from production scheduling to shipping logistics. The QMY12-15 arrives with its hydraulic demolding system, three-dimensional vibration mechanism, and steering assembly pre-tested at the factory. What remains is matching the voltage, confirming the mould set, and securing container space — a process measured in days rather than months.
Container Loading and Machine Dismantling for Shipment
The QMY12-15 weighs 4200 kg and measures 3250×2100×2300 mm in its assembled state. For container transport, the machine is partially dismantled — the hydraulic steering assembly and mould are secured separately to prevent damage during sea freight. Packing photographs and a loading plan are provided before the container seals, so the buyer knows exactly how the machine sits inside and what protection surrounds each component. [NEED_CITE: container loading standards for heavy machinery export]
Reading the Output Numbers the Right Way
The hydraulic system delivers 16–20 MPa while the three-dimensional mold vibration runs at 3200 Hz. Together, these determine the density and compressive strength of each block — rated at ≥15 MPa for the QMY12-15. A higher vibration frequency compacts the mix faster, but only if the hydraulic pressure is sufficient to hold the mold walls against the force. When these two parameters are mismatched, blocks crack during demolding or crumble under handling.
The molding cycle of 15–20 seconds per mold drives the hourly throughput. At 12 cavities per mold for 400×200×200 mm hollow blocks, that cycle yields 2,880 pieces per hour. Narrower formats fill more cavities in the same footprint, which is why 400×100×200 mm blocks reach 5,280 pieces per hour under the same cycle time. The raw material — whether river sand or fly ash — affects how quickly the mix reaches full compaction within each cycle. [NEED_CITE: relationship between vibration frequency and block density in egg laying machines]
The Cost of Skipping the Voltage Check Before Dispatch
When voltage and frequency are confirmed after the machine has already shipped, the buyer faces a transformer purchase at the destination port or, worse, a motor rewind. The 16 kW total power requirement means a mismatch can damage the vibration motor before the first test run. This is the kind of delay that erases the advantage of buying a mobile block machine in stock in the first place — the machine arrives, but it cannot run.
Why Buyers Working to Deadlines Source Here
The QMY12-15 is specified as a single system: machine, mould, hydraulic steering, and vibration mechanism are matched at the factory, not assembled from separate suppliers after the order is placed. Dispatch lead time is quoted against actual stock positions, not production schedules. The mould set included in the shipment is confirmed against the buyer’s target block format before the container books. Voltage and frequency are locked to the site grid specification before the machine leaves Linyi. Operator training documentation travels with the machine so the crew can begin production on arrival day.
Documentation & Verification
- Factory test record showing block output on your target format before dispatch
- Hydraulic and electrical schematic matched to your confirmed voltage and frequency
- Mould drawing and format list for every cavity set included in the shipment
- Packing photographs documenting dismantling state and container loading plan
- Operation and maintenance manual in your site language
Installation, Commissioning & Support
- Level concrete ground required to support 4200 kg mass during vibration cycles
- 16 kW dedicated power circuit with confirmed voltage and frequency before connection
- Machine arrives partially dismantled; hydraulic steering and mould reattached on site
- First-run parameter adjustment against your local aggregate moisture and grading
- Mould change training so operators can switch between hollow block and kerb formats
Preparing Your Inquiry for a Fast Response
When reaching out about a mobile block machine in stock, include your target block format and daily output requirement so the right mould set ships with the machine. State your site voltage, frequency, and phase to prevent motor and control mismatches. Provide your raw material type and source — the aggregate grading affects how the 16–20 MPa hydraulic pressure and 3200 Hz vibration compact your specific mix.
Frequently Asked Questions
Q: Which QMY12-15 configurations are currently in stock and what is the dispatch lead time?
A: Stock availability depends on the mould set and voltage configuration you need. Standard hollow block moulds in common formats are typically held ready. Once your voltage, frequency, and mould format are confirmed, dispatch follows within a matter of days — not weeks. We quote the lead time against actual stock positions, not factory production schedules, so your project timeline stays intact.
Q: How is the QMY12-15 dismantled and loaded into a container for shipment?
A: The 4200 kg machine is partially dismantled for container transport. The hydraulic steering assembly and mould are secured separately to prevent damage during transit. A loading plan and packing photographs are shared before the container is sealed, so you know the exact arrangement and protection around each component upon arrival.
Q: What voltage and frequency options are available for immediate dispatch units?
A: The 16 kW total power system can be configured to match common industrial supply standards. The critical step is confirming your site voltage, frequency, and phase before the machine ships. Units held in stock can have their electrical configuration finalized quickly once your supply details are provided, avoiding transformer or motor issues at the destination.
Q: Which moulds ship with the machine and can additional formats be added?
A: The QMY12-15 supports hollow block, porous brick, road kerb, road brick, and grassing brick formats through mould changes. The mould set included in your shipment is confirmed during the order process to match your production priority. Additional moulds can be added to the same container, provided they fit within the loading plan and are confirmed before sealing.
Q: What does the 1-year warranty cover and how are spare parts supplied?
A: The warranty covers the whole machine for one year, excluding consumable spare parts. Hydraulic components, vibration motors, and the control system are included. When a wear part or mould requires replacement, supply is arranged based on part availability and shipping method — we confirm this process during the initial order so your first replacement does not cause unplanned downtime.