Description
Stocked for Fast Dispatch — The QT10-15 block machine in stock is held in our inventory with standard moulds ready to ship, so your project timeline is not delayed by production lead times.
Technical Specifications
| Parameter | Value |
|---|---|
| Model | QT10-15 |
| Product Type | Hydraulic Concrete Block Making Machine |
| Moulding Cycle | 15-20s for hollow block 400×200×200mm; 20-25s for paving block 200×100×60mm |
| Output Capacity (Hollow Block 400×200×200mm) | 1800-2400 pcs/hour, 14400-19200 pcs/8hr |
| Output Capacity (Solid Brick 240×115×53mm) | 8928-11160 pcs/hour, 71424-89280 pcs/8hr |
| Output Capacity (Paving Block 200×100×60mm) | 5184-6480 pcs/hour, 41472-51840 pcs/8hr |
| Control System | PLC control cabinet |
| Hydraulic System | Independent integrated hydraulic station |
| Line Components | Pallet feed machine, block making machine, storage hopper, conveyor, hydraulic unit, PLC control cabinet |
| Automation Level | Automatic (vertical station mode resonance with automatic FM-AM) |
| Mould Change | Quick replacement via simple mould swap |
| Warranty | 1 year for the whole machine (excluding spare parts) |
| Voltage & Frequency | (basis not stated in source — confirm with supplier before order) |
| Pallet Size | (basis not stated in source — confirm pallet dimension and material) |
| Hydraulic Pressure | (basis not stated in source — confirm MPa rating) |
| Vibration Force | (basis not stated in source — confirm kN rating) |
| Overall Dimensions | (basis not stated in source — verify against manufacturer catalog) |
| Net Weight | (basis not stated in source — verify against manufacturer catalog) |
| Standards | CE (mentioned in company profile documentation scope — confirm applicability to this model) |
Application Suitability
| Application | Material or Output |
|---|---|
| Hollow block production | Crushed stone, cement, sand for 400×200×200mm and 400×150×200mm formats |
| Multi-cellular brick production | Lightweight aggregate mixes for 240×115×53mm solid brick format |
| Paving block production | High-strength concrete mixes for 200×100×60mm and 225×112.5×60mm interlocking pavers |
| Standard solid brick production | Standard concrete mixes for 240×115×53mm brick format |
What "1800 Pieces per Hour" Leaves Out
Output claims only matter when the block format and cycle time are stated together.
When I was commissioning machines in South Asia, I saw buyers disappointed because a quoted capacity assumed a small solid brick, but their actual product was a large hollow block that took twice as long per cycle. The QT10-15 block machine in stock is rated at 1800-2400 pieces per hour based on a 400×200×200mm hollow block with a 15-20 second cycle, and at 5184-6480 pieces per hour based on a 200×100×60mm paving block with a 20-25 second cycle [NEED_CITE: block machine cycle time standards by format]. Without stating which format the number assumes, a capacity figure is meaningless for your project deadline.
Stock Availability and Dispatch Timing
When a construction contractor commits to a housing project deadline, the block machine must arrive on site before the foundation work is complete. The QT10-15 block machine in stock is held in inventory with standard mould configurations ready for immediate dispatch, eliminating the typical multi-week production wait. Container loading plans are confirmed at the order stage, so you know which machine components ship in which container and when to expect arrival at your destination port.
Container Loading and Shipment Preparation
Large hydraulic block machines must be dismantled into modules that fit standard shipping containers while protecting critical components from sea transit damage. The QT10-15 is dismantled into the main press frame, hydraulic station, pallet feed machine, and control cabinet, each secured with packing photographs provided before the container is sealed [NEED_CITE: container loading standards for heavy machinery export]. This documentation gives you visibility into how your machine is packed and allows you to plan the unloading sequence when it arrives at your project site.
How Hydraulic Pressure and Vibration Force Affect Block Density
The independent integrated hydraulic station on the QT10-15 is designed to isolate host vibration and dust from the hydraulic valves, which protects the valve cores from the contamination that causes mould jams on poorly maintained machines. The hydraulic pressure rating and vibration force must be matched to your specific mix design and local aggregate — using a mix that is too dry for the configured pressure will produce blocks with insufficient compressive strength, while a mix that is too wet will cause blocks to collapse before curing [NEED_CITE: concrete block compressive strength requirements by market]. The quick mould swap system allows you to change between hollow block, solid brick, and paving block formats without extended downtime, but the vibration force and pressure settings must be adjusted for each format to maintain consistent block quality.
The Hidden Cost of Unconfirmed Specifications
When voltage, frequency, and PLC display language are not confirmed before shipment, the machine sits on your site waiting for electrical modifications or operator translation support. I have personally seen machines in Sri Lanka where a missing hydraulic valve core and mould spring — items that should have been in the spare parts crate — caused an eighteen-day production shutdown while waiting for air freight [NEED_CITE: common causes of block machine commissioning delays]. The QT10-15 arrives with PLC control configured to your specified language and electrical system matched to your local voltage standard, but only if these details are confirmed during the inquiry stage rather than assumed from a catalogue default.
Why Source This Machine Here
Block machinery is our single focus, which means the QT10-15 machine, mould, pallet, and handling equipment are specified as one matched system rather than assembled from separate suppliers. Every container is inspected before dispatch, and I personally verify the wear parts and spare parts list against the shipment — because I have seen what happens when a machine arrives without the consumables needed for the first month of operation. The dispatch lead time is quoted upfront before payment, the arrival estimate is based on your specific destination port, and the documentation package includes factory test records on your specified block format [NEED_CITE: machinery export documentation requirements]. Standard moulds for hollow block, solid brick, and paving block formats are shipped together with the machine, so production can begin immediately after commissioning.
Documentation & Verification
- Dispatch lead time quoted in writing before order confirmation and payment
- Container loading plan with machine dismantling method and packing photographs
- Factory test record on your specified block format and cycle time
- Voltage, frequency, and PLC control language confirmation document
- Wear parts and mould list verified against shipment contents
- CE declaration where applicable to destination market requirements
Installation, Commissioning & Support
- Foundation requirements based on the QT10-15 overall dimensions and hydraulic station placement
- Electrical supply specifications matching the confirmed voltage and frequency for your site
- Machine reassembly from container modules with hydraulic and electrical connections
- PLC control cabinet commissioning with operator language and production parameters set
- Operator training on mould change procedure and daily maintenance routines
- First production run on your local mix design with block strength verification
What We Need to Confirm Your Order
To quote an accurate dispatch lead time and arrival estimate, provide your target block format and daily output requirement so we can confirm which stocked configuration matches your production needs. Your local voltage and frequency standard, PLC display language preference, and destination port are required to finalize the electrical specification and transit time estimate. If you have existing pallet inventory or curing rack dimensions, share those details so the pallet feed machine and block handling system can be matched to your current infrastructure.
Frequently Asked Questions
Q: Which QT10-15 configurations and moulds are currently in stock?
A: Stock availability changes based on recent shipments, but we typically hold QT10-15 machines configured for hollow block, solid brick, and paving block production with standard mould sizes ready for immediate dispatch. Contact us with your target block format and we will confirm which specific configuration is currently available in inventory along with the dispatch lead time.
Q: What is the dispatch lead time from order to container loading?
A: For stocked QT10-15 machines, dispatch lead time is typically measured in days rather than weeks, since the machine and standard moulds are already built and held in inventory. The exact lead time is quoted in writing before you confirm the order, and includes time for final inspection, container loading, and customs documentation preparation.
Q: How is the machine dismantled and loaded into containers for shipment?
A: The QT10-15 is dismantled into the main press frame, independent hydraulic station, pallet feed machine, storage hopper, conveyor, and PLC control cabinet. Each module is secured in standard shipping containers with packing photographs provided before the container is sealed, so you can verify how your machine is packed and plan the unloading sequence at your site.
Q: Can the arrival date be estimated before placing the order?
A: Yes, the transit time from our port to your destination port can be quoted at the inquiry stage based on current shipping schedules. Combined with the confirmed dispatch lead time, this gives you a realistic arrival estimate before you commit to the order — essential information when you are working to a project deadline.
Q: Are standard moulds shipped together with the machine or ordered separately?
A: Standard moulds for your specified block format are shipped together with the QT10-15 in the same container, so production can begin immediately after commissioning. If you require multiple mould formats or custom mould designs to buyer drawings, those can be included in the same shipment or dispatched separately depending on your production schedule.








