Description
Stock-Verified Dispatch — Lead times quoted against actual warehouse inventory, not a factory forecast, with the QT10-15 block machine in stock ready for container loading.
Technical Specifications
| Parameter | Value |
|---|---|
| Model | QT10-15 |
| Product Type | Automatic Concrete Block Making Machine |
| Control System | PLC control cabinet |
| Hydraulic System | Independent integrated hydraulic station |
| Vibration Mode | Vertical station mode resonance, automatic FM-AM |
| Mould Change | Simple replacement for multi-format production |
| Components Included | Pallet feed machine, block making machine, storage hopper, conveyor, hydraulic unit, PLC control cabinet |
| Cycle Time (400×200×200mm hollow block) | 15–20 s |
| Output (400×200×200mm hollow block, 10 pcs/mould) | 1,800–2,400 pcs/h; 14,400–19,200 pcs/8 hr |
| Cycle Time (400×150×200mm hollow block) | 15–20 s |
| Output (400×150×200mm hollow block, 12 pcs/mould) | 2,160–2,880 pcs/h; 17,280–23,040 pcs/8 hr |
| Cycle Time (240×115×53mm solid brick) | 15–20 s |
| Output (240×115×53mm solid brick, 62 pcs/mould) | 8,928–11,160 pcs/h; 71,424–89,280 pcs/8 hr |
| Cycle Time (200×100×60mm paving block) | 20–25 s |
| Output (200×100×60mm paving block, 27 pcs/mould) | 5,184–6,480 pcs/h; 41,472–51,840 pcs/8 hr |
| Cycle Time (225×112.5×60mm paving block) | 20–25 s |
| Output (225×112.5×60mm paving block, 24 pcs/mould) | 4,032–5,040 pcs/h; 32,256–40,320 pcs/8 hr |
| Assembly State | Complete line with supporting equipment |
| Warranty | 1 year (excluding spare parts) |
| Certification | CE (where applicable) |
Application Suitability
| Application | Material or Output |
|---|---|
| Hollow block production | Crushed stone, sand, cement, fly ash aggregate mixes |
| Solid brick manufacturing | River sand, stone dust, cement blends |
| Paving block and interlocking paver | Granite chips, basalt aggregate, cement |
| Kerbstone and porous brick | Coarse aggregate with controlled water-cement ratio |
| On-site contractor production | Local quarry aggregate matched to regional standards |
| Multi-format plant operation | Single machine producing several block types per shift |
What Dispatch Lead Time Actually Means for Your Project Deadline
A quoted capacity figure is worthless if the QT10-15 block machine in stock ships weeks after your foundation is poured.
Contractors who plan a housing phase around a block delivery schedule often discover that the machine they ordered is still in production, or worse, sitting at a port waiting for a missing pallet feeder. I have watched entire crews stand idle because a single hydraulic hose was left off the packing list. [NEED_CITE: typical ocean freight transit times from Chinese ports to Latin American destinations] When a fast delivery block machine is promised, the real question is whether the container is already loaded or whether the factory is still waiting on components from their own suppliers.
Stock Status and the Loading Sequence
Every QT10-15 block machine in stock at our Linyi yard undergoes a pre-dispatch checklist before the crate is sealed. The hydraulic station is drained to the safe transport level, the PLC cabinet is wrapped in moisture-barrier film, and the mould is bolted to a separate skid so it cannot shift during ocean transit. Buyers receive packing photographs showing the exact container layout, including the dismantling sequence so the reassembly crew at destination knows which frame section comes off the floor first.
Why the Packing List Matters More Than the Brochure
A fast delivery block machine that arrives missing its conveyor belt or pallet feed unit is not fast at all. [NEED_CITE: machinery import customs clearance requirements in major Latin American ports] Before payment balance is released, we send a line-by-line packing list matched to the component list in the original quotation. This covers every bolt bag, hydraulic fitting, and spare seal kit. The goal is simple: when the container doors open at your site, nothing is missing and nothing is damaged.
Reading the Capacity Table Without Optimism Bias
The vertical station mode resonance system with automatic FM-AM vibration adjusts frequency to the mould installed, which is why cycle times differ between hollow blocks and paving blocks. A 400×200×200mm hollow block runs at 15–20 seconds per cycle producing 1,800–2,400 pieces per hour, while a denser 200×100×60mm paving block requires 20–25 seconds per cycle at 5,184–6,480 pieces per hour. The independent integrated hydraulic station sits away from the vibration zone, keeping oil temperature stable across consecutive shifts. Pallet size must match both the mould footprint and the curing rack spacing you already have on site. [NEED_CITE: pallet dimension standards for concrete block curing systems]
What Happens When Voltage and Language Are Confirmed Too Late
I once tracked a shipment where the buyer received a fully functional QT10-15, but the PLC display was in Chinese and the motor was wired for 380V/50Hz while the local grid ran 440V/60Hz. The machine sat for weeks while a variable-frequency drive was sourced locally. Confirming voltage, frequency, and control language before the machine leaves the factory eliminates this delay entirely. A fast delivery block machine is only fast if it runs the day the electrician finishes the final connection. [NEED_CITE: voltage and frequency standards by export market]
Why Procurement Starts with the Block Format, Not the Machine Price
Choosing a QT10-15 block machine in stock without first confirming which block format your market actually buys leads to ordering moulds that sit on a shelf. The simple mould replacement system allows format changeover within a shift, but only if the correct moulds are in the container. We match the mould list to the buyer’s product catalogue — hollow blocks for load-bearing walls, paving blocks for municipal contracts, interlocking bricks for housing projects — and confirm pallet dimensions against the curing area available.
Documentation & Verification
- Factory test record run on buyer’s specified block format before dispatch
- Hydraulic and electrical schematic matching the shipped serial number
- Container loading plan with dismantling sequence for reassembly
- Voltage, frequency, and PLC language confirmation sheet signed pre-shipment
- CE declaration included where destination market requires it
Installation, Commissioning & Support
- Foundation pad must support the combined weight of the press and hydraulic station
- Dedicated circuit required for the independent hydraulic unit to avoid voltage drop during vibration cycles
- Machine ships partially dismantled; reassembly sequence is documented with photographs
- PLC cabinet configured to buyer’s language before the electrician connects power
- Operator training covers mould changeover and cycle time adjustment per block format
- Wear parts list and first-replacement schedule provided at handover
What We Need from You Before Quoting Dispatch
To confirm whether a QT10-15 block machine in stock can meet your project timeline, tell us the target block formats and daily volume, your local voltage and frequency, and the PLC display language your operators need. If you already have curing racks or a forklift with a specific pallet size, share those dimensions so the pallet feed system is matched before the container is sealed.
Frequently Asked Questions
Q: Which QT10-15 configurations are currently in stock versus built to order?
A: Standard configurations with common pallet sizes and popular mould sets are typically held in the Linyi yard for immediate dispatch. Custom mould designs or non-standard voltage requirements require a production cycle. We confirm exact stock status in writing at inquiry stage so buyers can plan their project timeline around a verified ship date.
Q: What is the dispatch lead time and how is container loading handled?
A: Stocked units can be loaded within days of balance payment confirmation. The machine is partially dismantled to fit standard container dimensions, and a loading plan with photographs is shared before the container is sealed. This sequence ensures the reassembly crew at destination knows the exact order of frame and component installation.
Q: How is arrival time estimated and what customs documentation is provided?
A: Transit time depends on destination port and shipping line schedule, which we state at quotation stage. Customs documentation includes the commercial invoice, packing list, bill of lading, and certificate of origin where required. CE declaration is provided for markets that mandate it under local machinery import regulations.
Q: Can the machine be shipped partially assembled to speed up on-site commissioning?
A: Yes. The degree of pre-assembly is agreed before loading. Shipping the press frame with the hydraulic station already mounted reduces on-site work, while the PLC cabinet and conveyor are packed separately for protection. The packing photographs show exactly what arrives in what state.
Q: What is the warranty start date — shipment or commissioning?
A: The one-year warranty begins from the bill of lading date, as the machine is factory-tested before dispatch. Buyers who schedule installation promptly after arrival maximize their covered period. The warranty excludes consumable spare parts such as mould wear surfaces and hydraulic seals.








