Ready to Ship QT10-15 Brick Making Machinery for Concrete
In Stock · Ready to Ship
CE
Certified
ISO
9001:2015
108+
Countries
Fully Automatic Block Production Lines

Ready to Ship QT10-15 Brick Making Machinery for Concrete

<p><strong>QT10-15 Fully Automatic Block Making Machine, 21 MPa, 380V/220V</strong></p> <p>Stocked units with 1100x900 mm pallets ensure rapid container loading and transparent dispatch lead times. Upfront arrival estimates keep your construction schedule strictly on track without unexpected delays. </p> <ul> <li>Machinery test reports and video inspections provided before shipment</li> <li>Complete packing photographs and customs documentation included</li> </ul> <p>We supply the press, pallets, and standard moulds as one matched system with full installation support for immediate site deployment.</p>

  • European-Patented Airbag Damping System
  • Four-Motor Synchronous Vibration Technology
  • Siemens PLC Smart Control · Lifetime Tech Support
  • Customized Solution for Local Materials & Voltage
Lead Time
30 days
Warranty
12 mo
Sold
500+
Technical Excellence

Engineered for performance, built to last

Every parameter is verified through rigorous factory testing. No exaggeration -- just real production capacity backed by 320+ engineers.

Production Capacity
14,400 blocks/8h
Cycle Time
15-20 seconds
Total Power
88 kW
Operators
2-3 people

Product Description

$18,900.00

QT10-15 Fully Automatic Block Making Machine, 21 MPa, 380V/220V

Stocked units with 1100×900 mm pallets ensure rapid container loading and transparent dispatch lead times. Upfront arrival estimates keep your construction schedule strictly on track without unexpected delays.

  • Machinery test reports and video inspections provided before shipment
  • Complete packing photographs and customs documentation included

We supply the press, pallets, and standard moulds as one matched system with full installation support for immediate site deployment.

Description

Standard Mould Readiness — Standard block and paver moulds for the QT10-15 are kept in stock to ensure immediate container loading without waiting for custom fabrication delays.

Technical Specifications

Parameter Value
Model QT10-15
Product Type Fully Automatic Block Making Machine
Processing Brick Production Line
Method Hydraulic Pressure
Automation Level Automatic
Voltage 380 V, 220 V
Overall Dimensions (L×W×H) 7100x1600x2610 mm
Total Mass 7200 kg
Rated Pressure 21 MPa
Pallet Size 1100×900 mm
Mould Format / Brick Size 400x100x200 mm, 400x120x200 mm, 200x100x60 mm, 300x150x100 mm, 400x150x200 mm, 240x115x90 mm, 200x200x60 mm, 150x150x100 mm, 400x200x200 mm, 230x220x115 mm
Molding Cycle 15 s
Output Capacity Not explicitly stated (basis to be confirmed)
Workers Required 3-5
Raw Materials Concrete, cement, flyash
Core Components PLC, Pressure Vessel, Engine, Gear, Motor, Pump, Bearing, Gearbox
Color Options Customizable
Warranty 1 Year
Standards Machinery Test Report Provided, Video Outgoing-Inspection Provided

Application Suitability

Application Material or Output
Housing project wall construction Hollow blocks from concrete and cement
Landscaping and pathway paving Paving blocks from concrete and flyash
Load-bearing structural masonry Solid bricks from concrete and cement

Why Unconfirmed Voltage Delays Your Project Handover

Electrical mismatches discovered at the port of arrival will halt your site progress before the first block is pressed.

When buyers work toward a strict construction deadline, they often focus entirely on the dispatch date of a QT10-15 block machine in stock while overlooking the destination site’s electrical infrastructure. I have seen fully loaded containers arrive in Southeast Asian ports only to sit idle because the local grid frequency did not match the factory-wired motor specifications, or the PLC display language was unreadable to the local operators. Resolving these hardware and software conflicts on-site requires sourcing replacement contactors and rewriting control logic, turning a fast delivery automatic brick machine into a delayed liability [NEED_CITE: voltage and frequency standards by export market].

QT10-15 block machine in stock ready for container loading

Dispatch Timelines and Container Loading Plans

Securing a QT10-15 block machine in stock is only the first step in meeting a rigid project handover date. The physical dismantling of the 7100x1600x2610 mm mainframe and the strategic stacking of the 1100×900 mm pallets inside the shipping container dictate how quickly the equipment clears customs and reaches your foundation. We provide upfront arrival estimates and transparent loading schemes so your site preparation team knows exactly when to expect the heavy machinery.

Preventing Port Clearance Bottlenecks

A fast delivery automatic brick machine loses its scheduling advantage if it gets held up at the destination customs terminal. Missing machinery test reports or incomplete outgoing-inspection videos can trigger secondary physical inspections, adding unpredictable weeks to your timeline. By ensuring all export documentation, packing photographs, and CE declarations where applicable are finalized before the vessel departs, we keep the transit strictly on schedule [NEED_CITE: customs documentation requirements for heavy industrial machinery].

Interpreting the Press and Pallet Parameters

The 21 MPa rated hydraulic pressure combined with the 15-second molding cycle ensures that the main press operates continuously without waiting for the hydraulic system to recover between strokes. However, the press cycle is only half the equation; the 1100×900 mm pallet size must perfectly match your existing curing racks and forklift tine spacing. If the pallet dimensions do not align with your site’s material handling equipment, the fast delivery automatic brick machine will bottleneck at the offloading station, forcing manual intervention that negates the automatic designation.

Control cabinet and PLC interface detail for QT10-15

The Hidden Cost of Missing Upstream Equipment

Buying the main press to meet a deadline without simultaneously ordering the matching raw material feeding and automatic stacking stations creates a severe line imbalance. The QT10-15 will complete its 15-second molding cycle rapidly, but if the cured blocks are not automatically cubed and moved, the 3-5 required workers will spend their shifts manually clearing the output area. This upstream and downstream mismatch effectively downgrades your investment, leaving the host machine starved for empty pallets and halting production [NEED_CITE: production line balancing principles in concrete block manufacturing].

Why Procure Your Line Here

We treat block machinery as a single focus, meaning the QT10-15 main press, the specific moulds, and the handling equipment are specified as one matched system rather than assembled from separate suppliers. Our dispatch process is built around your actual site conditions, ensuring the voltage and control language are confirmed before the machine is crated. We provide moulds for the exact formats your local market demands, keeping standard sizes in stock for immediate loading. The automation level is selectable, allowing you to secure the core press now and add automatic stacking modules later as your plant expands.

Documentation & Verification

  • Factory test record on your specific 400x200x200 mm hollow block format before dispatch
  • Video outgoing-inspection showing the 15-second molding cycle under load
  • Complete packing photographs detailing the 7200 kg mainframe securing inside the container
  • Machinery test report verifying the 21 MPa hydraulic pressure stability
  • Customs documentation support aligned with your destination port requirements

Installation, Commissioning & Support

  • Foundation pouring guidelines calibrated to the 7100x1600x2610 mm overall dimensions and dynamic vibration loads
  • Dedicated electrical circuit sizing for the 380 V or 220 V main drive motors and hydraulic pumps
  • Dismantling and reassembly instructions for the 7200 kg total mass to ensure safe site offloading
  • Initial PLC parameter setting to match your specific concrete and flyash raw material ratios
  • Operator training focused on the quick-change mould system for the 10 standard block formats
  • Wear parts list covering the high-friction hydraulic and vibration components for the first year

Next Steps for Line Integration

To ensure the equipment arrives configured for your specific site, please provide your target daily output, the exact block formats you intend to run, and your local voltage and frequency standards. Let us know your available curing area dimensions and whether you require the automatic stacking and cubing stations included in the initial container load.

Frequently Asked Questions

Q: What is the exact dispatch lead time and estimated arrival for the QT10-15?
A: Because this model is kept in stock, the dispatch lead time is limited to the days required for final factory testing, crating, and inland transport to the port. We provide a transparent arrival estimate based on current vessel schedules to your specific destination port before the order is finalized, ensuring your construction timeline remains intact.

Q: Are standard moulds and pallets currently in stock for immediate loading?
A: Yes, standard moulds for common formats like 400x200x200 mm hollow blocks and 200x100x60 mm pavers, along with the matching 1100×900 mm pallets, are kept in inventory. This allows us to load them into the same container as the main press, preventing secondary shipments that could delay your project startup.

Q: How is the machine dismantled and loaded to ensure fast container turnaround?
A: The 7100x1600x2610 mm mainframe is systematically dismantled into major sub-assemblies that fit standard shipping containers. We use a calculated loading plan to maximize space and secure the 7200 kg mass, which speeds up both the loading process at our facility and the unloading sequence when the container reaches your site.

Q: What customs documentation is provided to prevent clearance delays?
A: We supply a comprehensive documentation package that includes the commercial invoice, packing list, bill of lading, machinery test reports, and CE declarations where applicable. This complete set is prepared in advance to satisfy destination customs requirements, preventing the machinery from being held at the port for secondary inspections.

Q: Can the 380V/220V voltage configuration be confirmed before shipment?
A: Absolutely. Confirming the exact voltage, frequency, and PLC display language is a mandatory step in our sales process before the machine is wired and crated. This prevents costly on-site electrical modifications and ensures the QT10-15 can be powered up immediately upon arrival at your facility.

Buy with Confidence

From inquiry to commissioning -- 4 transparent steps

  1. 01

    Technical Consultation

    Share your raw materials, capacity goals and voltage. Engineers reply within 24 hours.

  2. 02

    Custom Solution Design

    3D layout, mold drawings, electrical schematics and ROI calculation -- all free of charge.

  3. 03

    Production & Inspection

    Weekly progress photos, video reports, and virtual or on-site factory inspection.

  4. 04

    Installation & Lifetime Support

    On-site commissioning, operator training, spare parts supply and remote diagnostics.

Get a Quote

Talk to a senior engineer about Ready to Ship QT10-15 Brick Making Machinery for Concrete

Response within 24 hours · English / Español / العربية. Our 320+ engineers will tailor a solution to your local market, raw materials and capacity needs.

Send Project Brief

By submitting, you agree to be contacted by Shandong Shiyue. We respect your privacy.

Ready to start your concrete block production line?

Join 500+ factories worldwide using Shandong Shiyue machinery. Get your customized proposal in 24 hours.