QT4-30 Block Making Equipment Ready to Ship for Hollow Block
In Stock · Ready to Ship
CE
Certified
ISO
9001:2015
108+
Countries
Mobile block machine

QT4-30 Block Making Equipment Ready to Ship for Hollow Block

<p><strong>QMY4-30 Mobile Egg-Laying Block Making Machine, 5 kW, 30s Cycle Time</strong> — single-unit machine producing hollow blocks and solid bricks directly on the ground, no pallets or fixed plant required. Stocked for prompt dispatch with container loading planned upfront.</p> <ul> <li>400×200×200 mm hollow block: 480 pcs/h (4 pcs/mould)</li> <li>400×100×200 mm hollow block: 840 pcs/h (7 pcs/mould)</li> <li>Changeable moulds, 950 kg weight for easy site relocation</li> </ul> <p>Dispatch lead time and packing photographs confirmed before shipment so your project schedule stays on track.</p>

  • European-Patented Airbag Damping System
  • Four-Motor Synchronous Vibration Technology
  • Siemens PLC Smart Control · Lifetime Tech Support
  • Customized Solution for Local Materials & Voltage
Lead Time
30 days
Warranty
12 mo
Sold
500+
Technical Excellence

Engineered for performance, built to last

Every parameter is verified through rigorous factory testing. No exaggeration -- just real production capacity backed by 320+ engineers.

Production Capacity
14,400 blocks/8h
Cycle Time
15-20 seconds
Total Power
88 kW
Operators
2-3 people

Product Description

QMY4-30 Mobile Egg-Laying Block Making Machine, 5 kW, 30s Cycle Time — single-unit machine producing hollow blocks and solid bricks directly on the ground, no pallets or fixed plant required. Stocked for prompt dispatch with container loading planned upfront.

  • 400×200×200 mm hollow block: 480 pcs/h (4 pcs/mould)
  • 400×100×200 mm hollow block: 840 pcs/h (7 pcs/mould)
  • Changeable moulds, 950 kg weight for easy site relocation

Dispatch lead time and packing photographs confirmed before shipment so your project schedule stays on track.

Description

Stocked configuration — Every QMY4-30 is verified against your site voltage and frequency before dispatch, eliminating the three-week delay caused by mismatched motors on arrival.

Technical Specifications

Parameter Value
Model QMY4-30
Product Type Mobile Egg-Laying Block Making Machine
Rated Power 5 kW
Molding Cycle Time 30 seconds
Overall Dimensions (L×W×H) 1200 × 1200 × 1100 mm
Net Weight 950 kg
Automation Level Manual / egg-laying mobile type
Mould Format Options Hollow block, solid brick (mould changeable)
Output Capacity 480 pcs/h based on 400×200×200 mm hollow block, 4 pcs/mould
Output Capacity 600 pcs/h based on 400×150×200 mm hollow block, 5 pcs/mould
Output Capacity 840 pcs/h based on 400×100×200 mm hollow block, 7 pcs/mould
Output Capacity (8-hour shift) 3,840 / 4,800 / 6,720 pcs corresponding to above formats
Assembly State Single-unit mobile machine, no fixed plant required
Raw Materials Cement, sand, crushed stones, slag
Voltage & Frequency Configurable to buyer’s site supply (confirm before dispatch)
Control System Confirm PLC or relay logic with supplier
Pallet System Not applicable (egg-laying type, blocks laid on ground)

Application Suitability

Application Material or Output
On-site block production for building contractors Hollow blocks from cement, sand, and crushed stone directly at the build site
First block-making operation for small entrepreneurs Solid bricks and hollow blocks with minimal site preparation
Housing and development project block supply Local production of standard formats to eliminate transport delays
Remote or rural construction sites Egg-laying production without fixed curing racks or pallet circuits

Why the Voltage Question Must Come Before Dispatch

Confirming your site voltage and frequency before the machine leaves the factory is the single step that prevents a multi-week project stall.

I once watched a mobile block machine sit idle on a job site in South America for three weeks because the motor was wound for 380V/50Hz while the local grid ran 440V/60Hz. A variable frequency drive had to be air-freighted, and the contractor paid idle-crew costs the entire time. For buyers searching for a mobile block machine in stock fast delivery, the speed advantage disappears entirely if the electrical specification is wrong [NEED_CITE: voltage and frequency standards by export market]. The QMY4-30 ships as a single-unit machine, which means the motor, wiring, and control panel all must match the destination grid before the crate is closed.

QMY4-30 mobile block machine in stock fast delivery egg-laying type on construction site

Dispatch Timeline and Stock Positioning

Buyers working against a construction deadline cannot wait through a standard production cycle. The QMY4-30 is maintained as a mobile block machine in stock fast delivery option, meaning the core press, vibration assembly, and travel frame are assembled and tested ahead of order confirmation. Once your voltage and frequency are verified and the mould format is locked, the remaining work is final inspection, packing, and container loading.

What "Ready to Ship" Actually Covers

Stock availability means the machine body and standard moulds are built. It does not mean the electrical package is pre-wired for every market. Before dispatch, the motor winding, contactor ratings, and control panel labeling are matched to the buyer’s confirmed supply. This step takes a short period but prevents the costly on-site rework that turns a fast delivery into a project delay [NEED_CITE: CE machinery directive requirements for industrial equipment].

Reading the Output Figures Honestly

The QMY4-30 completes a moulding cycle in 30 seconds, but the hourly and shift outputs depend entirely on which block format you run. With a 400×200×200 mm hollow block mould holding 4 pieces, the machine produces 480 pieces per hour. Switch to a 400×150×200 mm mould with 5 cavities and the rate rises to 600 pieces per hour. A 400×100×200 mm mould with 7 cavities yields 840 pieces per hour. These are the only defensible output figures because they are tied to a stated format, cycle time, and mould cavity count. Any claim that ignores the block format leaves the buyer guessing at real daily throughput.

QMY4-30 mould assembly and vibration motor detail view

What Happens When Voltage Is Assumed Instead of Confirmed

A motor wound for the wrong frequency runs at the incorrect speed, which changes the vibration force delivered to the mould. Blocks come out under-compacted, crack during curing, and fail the compression test. The contractor blames the machine, but the root cause is a specification gap at the ordering stage [NEED_CITE: motor winding and frequency compatibility for export machinery]. Replacing the motor on site costs more than the confirmation step would have taken, and the schedule loss is unrecoverable.

Why Buyers Source This Machine Here

The QMY4-30 is treated as a matched system — machine, mould, and electrical package specified together rather than assembled from separate suppliers. Configuration is set against your target block format and local aggregate, not pulled from a catalogue default. Moulds for the formats your market actually sells are available, including custom drawings when standard options do not fit. The automation level starts at manual egg-laying, keeping the entry investment low while leaving room to add pallet-based semi-automatic lines later. Dispatch lead time is quoted upfront so you can plan container booking and site preparation against a real date.

Documentation & Verification

  • Factory test record run on your specified block format before dispatch
  • Voltage, frequency, and control language confirmation sheet signed before packing
  • Mould drawing and format list matching your ordered cavity configuration
  • Operation and maintenance manual with wear parts identification list
  • Packing photographs taken at crating stage for your freight forwarder
  • Customs documentation support including HS code and certificate of origin guidance

Installation, Commissioning & Support

  • Flat ground surface required; no concrete foundation needed for this 950 kg single-unit machine
  • Dedicated 5 kW circuit at confirmed voltage must be available before commissioning
  • Machine arrives fully assembled; only mould mounting and electrical connection on site
  • First production run supervised remotely or via on-site technician depending on location
  • Mould change procedure covered in manual; spare mould bolts and vibration rubbers included
  • Daily grease points marked on vibration shaft bearings and travel wheel axles

What We Need to Quote Your Shipment Accurately

To match the right electrical package and mould set to your order, share your local voltage and frequency, the block formats your market sells, and your target daily output. If you have a specific project deadline, tell us the site arrival date so we can confirm whether the current stock position meets it.

Frequently Asked Questions

Q: Is the QMY4-30 currently in stock and what is the dispatch lead time?
A: The QMY4-30 is maintained as a stocked model. Once you confirm voltage, frequency, and mould format, final inspection and packing are completed before container loading. Dispatch lead time is quoted at inquiry stage based on current stock position and your specific electrical requirements.

Q: How is the machine packed and loaded into a container for shipment?
A: The QMY4-30 is packed in a plywood crate measuring approximately 3 cubic meters. As a single-unit mobile machine weighing 950 kg, it can be loaded into a standard container with a forklift. Packing photographs are shared before the container is sealed.

Q: What arrival estimate can I expect from order confirmation to site delivery?
A: The timeline depends on your destination port and shipping route. Sea freight transit time is quoted at order confirmation alongside the dispatch date so you can plan site preparation and crew scheduling around a known arrival window.

Q: Are voltage and motor specifications confirmed before shipment to match my local power supply?
A: Yes. Before the machine leaves the factory, your site voltage and frequency are confirmed and the motor, contactors, and control panel are matched accordingly. This step is non-negotiable in our dispatch process to prevent on-site electrical failure.

Q: What documentation is provided for customs clearance and on-site commissioning?
A: You receive a factory test record, voltage confirmation sheet, operation manual, mould drawing, packing list, and customs documentation support. Certificate of origin and any applicable CE declaration are included based on your destination country requirements.

Buy with Confidence

From inquiry to commissioning -- 4 transparent steps

  1. 01

    Technical Consultation

    Share your raw materials, capacity goals and voltage. Engineers reply within 24 hours.

  2. 02

    Custom Solution Design

    3D layout, mold drawings, electrical schematics and ROI calculation -- all free of charge.

  3. 03

    Production & Inspection

    Weekly progress photos, video reports, and virtual or on-site factory inspection.

  4. 04

    Installation & Lifetime Support

    On-site commissioning, operator training, spare parts supply and remote diagnostics.

Get a Quote

Talk to a senior engineer about QT4-30 Block Making Equipment Ready to Ship for Hollow Block

Response within 24 hours · English / Español / العربية. Our 320+ engineers will tailor a solution to your local market, raw materials and capacity needs.

Send Project Brief

By submitting, you agree to be contacted by Shandong Shiyue. We respect your privacy.

Ready to start your concrete block production line?

Join 500+ factories worldwide using Shandong Shiyue machinery. Get your customized proposal in 24 hours.